  • 2020-06-03

    On July 1, 2016, JSDJ signed a contract (2,260 million RMB) with Yanchang Petroleum (Group) - Refining & Petrochemical Company under which its scope of work was to deliver a turnkey solution to recovering waste heat from a 1,800,000 T / Y Catalytic Cracking Plant. All components had been manufacture
  • 2020-06-03

    Natural circulation refers to the natural circulation of steam and water. This type of circulation is driven by force incurred by the density differentiation of steam and water. It only requires a feed-water pump to initiate the flow without relying on any other type of mechanical pump to stabilize
  • 2018-03-29

    End User: Domestic Chemical Industrial ParkDate of Contract: 2016-12-07Commissioning Date: 2018-01-28Drawing No.: 780Y Scope of Supply:Boiler Proper, waste heat boiler installation, instruments & valves, refractory, spare parts, etc.ASH Boiler - pipework, HRSG for rotary kiln, etc. Key Parameters: I
  • 2018-01-29

    End User: Cement Plant in Turkey Date of Contract: 2017-03-15Delivery Date: 2017-08-30Estimated Commissioning Date: 2018-03-15 Scope of Supply:AQC Boiler - waste heat boiler steam drum, evaporation section, superheater, hot water section, economizer, boiler casing, instruments & valves, steel frame
  • 2017-11-23

    End User: Domestic ClientDate of Contract: 2017-04-10Delivery Date: 2017-07-30Waste Heat Recovery Boiler - Scope of Supply:Boiler Steel Frame, platform & staircase, boiler flue interface, boiler evaporator, boiler superheater, boiler economizer, boiler preheater, pipework, boiler bypass cooler, boil
  • 2017-11-03

    End User: Domestic Client Date of Contract: 2017-01-06Delivery Date: 2017-05-10 to 2017-08-10 Waste Heat Recovery Boiler Scope of Supply:1. Waste Heat Boiler for Liquid Waste Incinerator - boiler steam drum, boiler evaporator, boiler superheater, boiler economizer, boiler pipework, boiler interconn
  • 2017-11-03

    End User: Domestic Client Date of Contract: 2016-12-9Delivery Date: 2017-08-30 Waste Heat Recovery Boiler - Scope of Supply:boiler steel frame, boiler platform, boiler staircase, boiler flue interface, boiler evaporator, boiler superheater, boiler economizer, boiler pipework, boiler steam drum room
  • 2017-10-23

    End User: Client in Democratic Republic of the CongoDate of Contract: 2017-02-21Delivery Date: 2017-07-05 Scope of Supply: Boiler Proper (steam drum, evaporation tube bundle, boiler shell, pipework, steel frame, platform & staircase, cooling tube bundle, etc. ) Key Parameters: Inlet gas temp: 900 Ce
  • 2017-10-09

    On Feb 17, 2017, JSDJ was awarded an EPC contract by San Bao Steel Corp in the province of Fujian. JSDJ’s task was to provide an overall waste heat recovery solution for two of the existing Electric Furnaces. The main challenge for JSDJ was that the periodic fluctuations of gas flow & temperature ar
  • 2016-12-01

    On September 30, 2015, JSDJ was awarded a contract (contract value - 11,300,000) by Shandong Molong Petroleum to deliver a waste heat recovery solution to their existing DRI (direct reduced iron) HISMELT process. This project was commissioned on November 17, 2016. With years of innovative experie
  • Total 3 pages  Go to Page
  • Go

QUICK LINKS

CONTACT US

Address:No. 9 Huarui South Rd, Yancheng, China, 224005
Tel:+86-515-88583229
Phone:+86 13375256375
Fax:+86-515-88583229
E-mail:don-davison@djzg.org
Manager: Don Davison   
Website: www.chinawasteheatboiler.com

Copyright  JSDJ Heavy Industry Co.,Ltd All rights reserved.