Views: 1 Author: Site Editor Publish Time: 2018-01-29 Origin: Site
End User: Cement Plant in Turkey
Date of Contract: 2017-03-15
Delivery Date: 2017-08-30
Estimated Commissioning Date: 2018-03-15
Scope of Supply:
AQC Boiler - waste heat boiler steam drum, evaporation section, superheater, hot water section, economizer, boiler casing, instruments & valves, steel frame, platform, staircase, flue interface, waste heat boiler auxiliary items, etc.
ASH Boiler - pipework, HRSG for rotary kiln, etc.
Key Parameters:
Inlet gas temp: 340 / 335 Celsius
Outlet gas temp: 116 Celsius
Steam pressure: 2.35 / 0.2 MPA
Steam temp: saturated steam temp / 160 Celsius
Steam output: 14.6 / 9.4 / 14.8 / 9.3 T / H
Address:No. 9 Huarui South Rd, Yancheng, China, 224005
Tel:+86-515-88583229
Phone:+86 13375256375
Fax:+86-515-88583229
E-mail:don-davison@djzg.org
Manager: Don Davison
Website: www.chinawasteheatboiler.com