Delivery Completed - Waste Heat Boilers For Cement Kiln

End User: Cement Plant in Turkey  

Date of Contract: 2017-03-15

Delivery Date: 2017-08-30

Estimated Commissioning Date: 2018-03-15

 

Scope of Supply:

AQC Boiler - waste heat boiler steam drum, evaporation section, superheater, hot water section, economizer, boiler casing, instruments & valves, steel frame, platform, staircase, flue interface, waste heat boiler auxiliary items, etc.

ASH Boiler - pipework, HRSG for rotary kiln, etc.

 

Key Parameters:

 

Inlet gas temp: 340 / 335 Celsius

Outlet gas temp: 116 Celsius

Steam pressure: 2.35 / 0.2 MPA

Steam temp: saturated steam temp / 160 Celsius

Steam output: 14.6 / 9.4 / 14.8 / 9.3 T / H